Design & Supervsion Engineer

Photo Gallary
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image



Imad Aljabr consultants

(K.S.A) From 24/11/2012 to 09/02/2014:

Job title  :   : Design/Technical office Engineer, Project consultant engineer..

A- Design scope :


Responsibilities:
1- Structural design for villas, water tanks & buildings.
2- Steel structural design (Toyota & Cadillac workshop, Morouj compound recreation sport center & 18 meter elevated tank).
3- Preparing of hydraulic models and studies for the project of Morouj Compound water & Sewer networks in Alehssa.
4- Technical office engineer revise electrical, plumping, h.vac, mechanical, architectural and structural drawings of projects.
5- Preparing bill of quantities and technical specification for items.
6- Design for 7 stories parking building in K.S.A.
7- Design for stadium in K.S.A.

B- Supervision scope


Responsibilities:
8- Supervision of Aramco Morouj compound (54 villas, recreation steel building, steel tower carrying water tank, gates building and pump room).
- Concrete and steel constructions paints, ceramic, marble, electrical, plumping, fire alarm, h.vac, isolation, carpentry and aluminum works.
- Infra structure works (water, sewage and irrigation networks, low current works and electrical installations).
- Roads and landscaping (roads, interlock, planting works).
9- Supervision on execution of steel and concrete constructions in ALhasaa.
10- Ensure that all test reports are verified to meet contract requirements.
11- Ensure that the quality of materials and installation of the work is in accordance with the quality plan identified for the project.
12- Follow up time schedules, and all permits needed from contractors, and ensure that they are in accoredance with contract agreement.
13- Review shop drawings, RFI & RFP prior to implementation.
14- Review & issue payments & variations order for approval from client.
15- Check all materials in site before installation and all tests for them.